Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP17-0304

Parcel: 14042046D


Addresses:

6610 S TUCSON BL


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP17-0304

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
01/12/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DROBERT5 - I RECHECKED THE ADA PARKING LOCATION AND ADJACENT ACCESS AISLE AND HAVE FOUND THAT THEY ARE NON COMPLIANT IN THE AREAS THAT HAVE EXISTING PAVEMENT. I ADVISED THE CONTRACTOR THAT i WILL SUPPORT A TCO FOR THIS SITE BUT WILL NOT SUPPORT A FULL FINAL INSPECTION. I HAVE ADVISED HIM HE WILL NEED TO GO DOWNTOWN AND MEET WITH STEVE SHIELDS AND JOHN VAN WINKLE TO DETERMINE WHAT WILL BE NEEDED TO MAKE THIS SITE COMPLIANT.
01/11/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THE FINAL GRADING, THE CREWS ARE WORKING ON THE INSTALLATION OF THE AC THROUGHOUT THIS SITE. I HAVE ADVISED THE CONTRACTOR AND THE PAVING CONTRACTOR THAT THE AREA THAT HAS BEEN NOTED FOR THE NEW ADA HANDICAP SPOT AND ACCESS AISLE IS NON COMPLIANT AT THIS TIME. I HAVE ASKED THEM TO LOOK OVER THE SITE AND MAKE SURE THAT ALL OF THE PAVEMENT HAS BEEN CHECKED TO ENSURE THAT IT IS COMPLIANT FROM THE PARKING SPACES INTO THE BUILDING. ALSO ON THIS SITE THE CREWS HAVE LAID OUT THE BICYCLE PARKING LOCATION IN AN AREA THAT IS NOT COMPLIANT. I HAVE ADVISED THEM THAT THE BICYCLE LOCATION WILL NEED TO BE IN AN AREA THAT HAS A CLEAR SPACE OF 4' BY 6' TO ENSURE THAT IT IS ACCESSIBLE. IF THIS LOCATION CAN NOT BE FOUND WITHIN THE CONCRETED AREA THEN THEY MAY NEED TO POUR ANOTHER SLAB IN ANOTHER LOCATION FOR THE BICYCLE EQUIPMENT. I WILL CHECK THIS SITE ON 1/12/19 TO VERIFY THAT THEY HAVE MADE THE ADA PARKING AND ACCESS AISLE COMPLIANT ONCE IT HAS BEEN STRIPED.
01/08/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THE FINAL GRADING INSPECTION. THE CONTRACTOR IS CURRENTLY WORKING ON THE GRADING FOR THE ABC AND THE PLACEMENT OF THE PAVEMENT. I HAVE ADVISED THE CONTRACTOR THAT THEY WILL NEED TO PAY ATTENTION TO THE AREAS THAT ARE FOR HANDICAP PARKING AND ACCESS INTO THE BUILDING. THESE AREAS WILL NEED TO BE LESS THAT 2% FOR ALL RUNNING AND CROSS SLOPES WHEN THIS SITE IS CHECKED AT THE FINAL GRADING STAGE. I HAVE REMINDED THE CONTRACTOR TO MAKE SURE THAT ALL OF THE REVISED DRAWINGS ARE MADE AVAILABLE FOR THE FINAL INSPECTION OF THIS SITE.
12/13/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Note 2 short-term bicycle parking spaces required, long-term bicycle spaces not required.