Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP17-0299
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/06/2018 | PDSD Engineering Division Pre-Construction SITE | MRUSSO1 | Approved | Entered by DROBERT5 - 1) INSTALL STORM WATER SEDIMENT CONTROLS PER YOUR SWPPP 2) POST A COPY OF YOUR NOI 3) INSTALL A STABILIZED ENTRANCE/CONCRETE WASH OUT ON SITE 4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 5) CALL FOR INSPECTION FOR UNDERGROUND STORM WORK PRIOR TO COVER 6) CALL FOR INSPECTION FOR ANY CHANGES OR CONCERNS TO THE SITE/GRADING /LANSCAPING. |