Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP17-0299
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
05/20/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
01/15/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
12/27/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THE CREWS ARE WORKING ON THE INTERIOR PORTION OF THIS SITE ONLY AT THIS TIME, NO EXTERIOR SITE WORK THIS WEEK. |
04/27/2018 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - PROGRESS INSPECTION: CONTRACTOR INSTALLING STORM PIPE ALONG SOUTH SIDE OF BLDG. INSTALL PER APPROVED PLANS - OK TO COVER |
04/10/2018 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) PROGRESS INSPECTION: INSTALL 18" HDPE TRUNK LINE ALONG SOUTH SIDE OF BLDG - PICS TAKEN 2) CALL FOR RE-INSPECTION PRIOR TO COVER CATCH BASINS INSTALL. |
04/05/2018 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSTALL OF 18" HDPE TRUNK LINE ALONG THE NORTH SIDE OF BLDG. 2) INSTALL OF 6" HDPE LATERALS AT NORTH SIDE OF SITE. 3) ALL INSTALLS PER COT/PC STD FOR STORM PIPE OK TO COVER PIPE. 4) PROVIDE A REVISED PLAN SHOWING THE CHANGE FROM CMP TO HDPE PIPE, TO INCLUDE APPROVAL FROM THE EOR AND CITY OF TUCSON. 5) CALL FOR INSPECTION PRIOR TO COVERING CATCH BASINS |
03/28/2018 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT SITE CHANGES OR CONCERNS AT THIS TIME |
02/27/2018 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SEDIMENT CONTROLS IN PLACE 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. |
05/20/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
04/09/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Walk site with GC and owners rep went over accessible parking accessible pathways stabilizing lot to the south that has been disturbed during construction went over certification letter from engineer of record for all grading and drainage. Went over physical separation at front entrance. And work to be completed for C of o. And temp C of o. |
03/28/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Rebar in trash enclosure walls OK |
05/20/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
04/16/2019 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by CMURPHY1 - is partial at this time for the interior slab only, the exterior slab will be done at a later date. |
03/21/2019 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - OK FOR WALL |
06/01/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR WALL IN CATCH BASINS OK. |
05/31/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - CATCH BASINS ON EAST SIDE OF SITE REBAR OK |
05/30/2018 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) LOOKED AT RE-BAR FOR CATCH BASIN LOCATED ALONG THE NE CORNER OF THE SITE. RE-BAR WAS INSTALLED PER THE APPROVED PLANS - PICS TAKEN. 2) CALL FOR INSPECTION PRIOR TO CONCRETE ON REMAINING CATCH BASINS |