Permit: DP17-0299

Parcel: 141220250


Addresses:

9095 S RITA RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP17-0299

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
05/20/2019 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
05/20/2019 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
01/15/2019 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME.
12/27/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREWS ARE WORKING ON THE INTERIOR PORTION OF THIS SITE ONLY AT THIS TIME, NO EXTERIOR SITE WORK THIS WEEK.
04/27/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - PROGRESS INSPECTION: CONTRACTOR INSTALLING STORM PIPE ALONG SOUTH SIDE OF BLDG. INSTALL PER APPROVED PLANS - OK TO COVER
04/10/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) PROGRESS INSPECTION: INSTALL 18" HDPE TRUNK LINE ALONG SOUTH SIDE OF BLDG - PICS TAKEN 2) CALL FOR RE-INSPECTION PRIOR TO COVER CATCH BASINS INSTALL.
04/05/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSTALL OF 18" HDPE TRUNK LINE ALONG THE NORTH SIDE OF BLDG. 2) INSTALL OF 6" HDPE LATERALS AT NORTH SIDE OF SITE. 3) ALL INSTALLS PER COT/PC STD FOR STORM PIPE OK TO COVER PIPE. 4) PROVIDE A REVISED PLAN SHOWING THE CHANGE FROM CMP TO HDPE PIPE, TO INCLUDE APPROVAL FROM THE EOR AND CITY OF TUCSON. 5) CALL FOR INSPECTION PRIOR TO COVERING CATCH BASINS
03/28/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE CHANGES OR CONCERNS AT THIS TIME
02/27/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS IN PLACE 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
05/20/2019 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
04/09/2019 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Walk site with GC and owners rep went over accessible parking accessible pathways stabilizing lot to the south that has been disturbed during construction went over certification letter from engineer of record for all grading and drainage. Went over physical separation at front entrance. And work to be completed for C of o. And temp C of o.
03/28/2019 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Rebar in trash enclosure walls OK
05/20/2019 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
04/16/2019 ENGR Grading Final DROBERTS Partial Approval Entered by CMURPHY1 - is partial at this time for the interior slab only, the exterior slab will be done at a later date.
03/21/2019 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - OK FOR WALL
06/01/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR WALL IN CATCH BASINS OK.
05/31/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - CATCH BASINS ON EAST SIDE OF SITE REBAR OK
05/30/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) LOOKED AT RE-BAR FOR CATCH BASIN LOCATED ALONG THE NE CORNER OF THE SITE. RE-BAR WAS INSTALLED PER THE APPROVED PLANS - PICS TAKEN. 2) CALL FOR INSPECTION PRIOR TO CONCRETE ON REMAINING CATCH BASINS