Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP17-0299
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2019 | SITE - Stormwater Follow-up | RLEDONNE | Approved | Entered by RLEDONN1 - |
03/15/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
02/05/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Met with GC about track out on science Park Drive and to add controls two outlets on west side of site |
01/28/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
01/08/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Met with G C on-site he said he would have have a sweeper called out to clean up track out on Street. He is added track out rock since last inspection |
12/27/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - THERE IS TRACKOUT NOTED ON THE LOCAL STREETS FROM THIS SITE THAT NEEDS TO BE CLEANED PRIOR TO THE NEXT INSPECTION, THERE ARE NO OTHER CONCERNS AT THIS TIME. |
12/12/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Add waddle on Southeast and Southwest side of sight and add track out to entrance walk site with GC one over Corrections. |
11/27/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Provide new waddle around catch Basin on South side of building. |
11/20/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
11/16/2018 | SITE - Stormwater Follow-up | RLEDONN1 | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/16/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - WADDIE Have been added to basin |
10/15/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/15/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/04/2018 | SITE - Stormwater Follow-up | BBENEDON | Correction Required | Entered by CMURPHY1 - Only concern is a Southeast storm drain, silt has overtaken the waddle. 09185 grading intermediate, the action is continued. No grading at this time work inside the building only. Thank you |
09/26/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
09/21/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CMURPHY1 - No concerns at this time. |
09/18/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
09/07/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
08/28/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
08/13/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
08/08/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
07/23/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
07/12/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - no concerns at this time. |
07/06/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
06/19/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
06/08/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO ONE ONSITE AT THE TIME OF THIS INSPECTION 3:26 PM, THERE ARE NO CONCERNS THAT HAVE BEEN NOTED AT THE TIME OF THIS INSPECTION. |
05/30/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SITE PROVIDE NOI AT GATE ON NORTH SIDE OF SITE. |
04/27/2018 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/13/2018 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME |
02/28/2018 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) SEDIMENT CONTROLS IN PLACE 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. |
02/14/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AFTER RAIN. |