Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP17-0299

Parcel: 141220250


Addresses:

9095 S RITA RD


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP17-0299

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
05/20/2019 SITE - Stormwater Follow-up RLEDONNE Approved Entered by RLEDONN1 -
03/15/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
02/05/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CBELL1 - Met with GC about track out on science Park Drive and to add controls two outlets on west side of site
01/28/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
01/08/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CBELL1 - Met with G C on-site he said he would have have a sweeper called out to clean up track out on Street. He is added track out rock since last inspection
12/27/2018 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - THERE IS TRACKOUT NOTED ON THE LOCAL STREETS FROM THIS SITE THAT NEEDS TO BE CLEANED PRIOR TO THE NEXT INSPECTION, THERE ARE NO OTHER CONCERNS AT THIS TIME.
12/12/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CBELL1 - Add waddle on Southeast and Southwest side of sight and add track out to entrance walk site with GC one over Corrections.
11/27/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CBELL1 - Provide new waddle around catch Basin on South side of building.
11/20/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
11/16/2018 SITE - Stormwater Follow-up RLEDONN1 Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/16/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CBELL1 - WADDIE Have been added to basin
10/15/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/15/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/04/2018 SITE - Stormwater Follow-up BBENEDON Correction Required Entered by CMURPHY1 - Only concern is a Southeast storm drain, silt has overtaken the waddle. 09185 grading intermediate, the action is continued. No grading at this time work inside the building only. Thank you
09/26/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
09/21/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CMURPHY1 - No concerns at this time.
09/18/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
09/07/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
08/28/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
08/13/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
08/08/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
07/23/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
07/12/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - no concerns at this time.
07/06/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
06/19/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
06/08/2018 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO ONE ONSITE AT THE TIME OF THIS INSPECTION 3:26 PM, THERE ARE NO CONCERNS THAT HAVE BEEN NOTED AT THE TIME OF THIS INSPECTION.
05/30/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE PROVIDE NOI AT GATE ON NORTH SIDE OF SITE.
04/27/2018 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/13/2018 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME
02/28/2018 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS IN PLACE 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
02/14/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AFTER RAIN.