Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP17-0284

Parcel: 11504329F


Addresses:

243 E SPEEDWAY BL


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP17-0284

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
08/01/2019 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by DMERANZ1 - COMPLETE AT THIS TIME.
03/26/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by CBELL1 - I met with Jack from Canyon builders. Please post your address. Please call for inspection of drainage header on north side of property. Call for inspections of water harvesting to tension areas prior to landscaping. Engineering inspector is responsible from property line to the building. A right of way permit is required for any work outside of the property line