Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 07/29/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DMERANZ1 - |
| 07/25/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Partial Approval |
Entered by DMERANZ1 - COMPLETE ALL WORK AS PREVIOUSLY NOTED ON THE APPROVED PLANS. |
| 07/23/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Provide a letter from the project engineer certified grade conformity.
Riprap is only 4 inches deep, plan requires 8 inches.
Depress water harvesting area number for 6 inches below curb opening as shown.
Remove materials from sidewalk at curb repair.
Jack with Canyon builders |
| 07/22/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Landscaping in progress, stake trees properly
Finish ground stabilization. Clean material stock piles and debris from parking lot. Complete curb and sidewalk currently under construction. |
| 08/01/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DMERANZ1 - |
| 07/22/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Landscaping in progress, stake trees properly
Finish ground stabilization. Clean material stock piles and debris from parking lot. Complete curb and sidewalk currently under construction. |
| 06/20/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Continued |
Entered by DMERANZ1 - Depressed areas appear to be adequate. Landscaper is starting to install irrigation and plants.
|
| 03/26/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Call for inspection of water harvesting areas prior to installing landscaping |