Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP17-0271

Parcel: 136326480


Addresses:

4360 S SKY HIGH PL

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
03/01/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by VFLORES1 - Walk site with GC stabilization to all disturb soil install driveway per approved plans.
12/04/2018 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS.
04/07/2021 ENGR Engineering Final MHERNANDEZ Approved Entered by VLEON1 -
03/01/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by VFLORES1 - complete driveway and stabilization for final.
12/04/2018 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS.
10/11/2023 ENGR Engineering Final Passed