Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP17-0267
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/11/2020 | ENGR Engineering Final | RLEDONNE | Approved | Entered by JSCHNEI2 - Approved. |
11/18/2021 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/06/2021 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by RSALDAT1 - PARTIAL AT THIS TIME PENDING THE FOLLOWING ISSUES THAT NEED TO BE ADDRESSED 1) PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE FOR THE FINAL INSPECTION. 2) PROVIDE THIS DEPARTMENT WITH THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY NOTICE OF TERMINATION LETTER FOR THIS PERMIT. |
04/07/2021 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by VLEON1 - |
11/24/2020 | ENGR Engineering Final | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. TEP had access road closed to site Not able to access site for inspection. |
09/17/2020 | ENGR Engineering Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Talk to Jason from Ashton he said he was working on revisions and the type of Hydro seed to use. |
09/11/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Provide revisions for all changes to approve plans including pipe installed on north east side of site and redirecting basin. Provide stabilization to all disturbed areas during construction. Provide certification from engineer of record so all grading and drainage all piping and head walls any concrete work that required rebar.Walk site with Jason Dave Roberts went over corrections that need to be made before final project. |
08/11/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Provide certification letter from engineer of record for all grading and drainage that has been installed per approved plans without Inspections by this Department. Per conversation with Jason and gone from Ashton construction. Note all rebar and installation of stormwater piping on site with out inspection has been installed properly Per Approved plans and added to letter. Complete all work on approve plans. Clean all stormwater piping of sediment and debris as well as riprap. Walk site withWent over work to complete for final in addition. |