Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP17-0267

Parcel: 14002002C


Addresses:

3950 E IRVINGTON RD


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP17-0267

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/11/2020 ENGR Engineering Final RLEDONNE Approved Entered by JSCHNEI2 - Approved.
11/18/2021 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
08/06/2021 ENGR Engineering Final DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL AT THIS TIME PENDING THE FOLLOWING ISSUES THAT NEED TO BE ADDRESSED 1) PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE FOR THE FINAL INSPECTION. 2) PROVIDE THIS DEPARTMENT WITH THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY NOTICE OF TERMINATION LETTER FOR THIS PERMIT.
04/07/2021 ENGR Engineering Final MHERNANDEZ Continued Entered by VLEON1 -
11/24/2020 ENGR Engineering Final RLEDONNE Continued Entered by PAHUMAD1 - Continue. TEP had access road closed to site Not able to access site for inspection.
09/17/2020 ENGR Engineering Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Talk to Jason from Ashton he said he was working on revisions and the type of Hydro seed to use.
09/11/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready. Provide revisions for all changes to approve plans including pipe installed on north east side of site and redirecting basin. Provide stabilization to all disturbed areas during construction. Provide certification from engineer of record so all grading and drainage all piping and head walls any concrete work that required rebar.Walk site with Jason Dave Roberts went over corrections that need to be made before final project.
08/11/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready. Provide certification letter from engineer of record for all grading and drainage that has been installed per approved plans without Inspections by this Department. Per conversation with Jason and gone from Ashton construction. Note all rebar and installation of stormwater piping on site with out inspection has been installed properly Per Approved plans and added to letter. Complete all work on approve plans. Clean all stormwater piping of sediment and debris as well as riprap. Walk site withWent over work to complete for final in addition.