Permit: DP17-0266

Parcel: 11504329G


Addresses:

203 E SPEEDWAY BL


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP17-0266

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
05/04/2021 ENGR Grading Final BBENEDON Denied Entered by VLEON1 - Denied. Note, per DR, building official needs to approve lack of access from speedway as well as trash and closure not inspected. University Commons phase 1 Canyon builders
11/19/2018 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - Begin over ex for new building.
10/25/2018 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - there is dirt work in progress on vacant lot east of paved parking area
09/17/2018 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - Grading for pavement and curbs. Provide trackout protection at east entrance.
10/25/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 -
11/09/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CBELL1 - okay for grout, provide cleanouts
11/07/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CBELL1 - footings and bollards okay for concrete.
11/06/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - a.m. inspection requested and provided, contractor still Excavating for trash enclosures no rebar has been installed yet. I provided our hand out to the GC and instructed him to reschedule for the inspection when they are ready.
10/25/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - use this inspection code for your trash enclosure
11/19/2018 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - Contractor preparing to install rip rap in north basin. Preparing Speedway entrance for pavement.
11/06/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - not ready at 8:30 a.m., contractor Excavating for trash and closure at this time.
10/30/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - Courtesy inspection for Rick and Christian with Canyon builders. Four-for-four 7979. Contractors are correcting the pedestrian access slope issues from 6th Avenue. Rick engineering is on site. We also have slope issues at the lower corner of the north most accessible parking space and the northernmost accessible striped pedestrian access. The Landscaping, retention basins, trash and closures, and access from Speedway Boulevard have not yet been installed. Building official approval will be necessary for a temporary C of o.
10/25/2018 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - contractor is installing concrete drive through
09/19/2018 ENGR Grading Final bbenedo1 Not ready for Inspection Entered by BBENEDO1 - Still need track-out controls.
09/17/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CMURPHY1 - Provide track out control at East entrance grading for pavement and curbs okay. Canyon building asked if they can get a TCO without vehicle access from Speedway and the trash enclosures.
04/26/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE CONCERNS AT THIS TIME