Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP17-0265

Parcel: 13015001A


Addresses:

4646 E 22ND ST


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP17-0265

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
12/13/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
12/13/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
12/13/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
12/13/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
05/18/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) PROVIDE AN APPROVAL OF THE PRESSURE TEST RESULTS OF THE STORM PIPE INSTALLATION BY THE EOR, PRIOR TO FINAL APPROVAL. 2) ENSURE EACH SECTION OF STORM PIPE INSTALLED UNDER A BLDG IS LEAK TESTED - PER THE COT AND YOUR EOR
05/09/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE ENGINEER OF RECORD CONTACTED ME TO DISCUSS WHAT THEY WILL BE DOING FOR THE TESTING OF THE 24 INCH DRAIN PIPE. THE CONTRACTOR HAS DETERMINED THAT THEY CURRENTLY HAVE SOME LEAKS WITHIN THE JOINT AND WILL BE WORKING ON TESTING EACH UNIT AND MAKING THE NECESSARY REPAIRS AS NEEDED. WHEN THEY HAVE ALL OF THE PIPE INSTALLED FULLY THEN THEY WILL BE PERFORMING A WATER TEST ON THE PIPE. THIS TEST WILL BE SCHEDULED SO THAT ALL OF THE PARTIES CAN BE IN ATTENDANCE AS THE TEST IS BEING PERFORMED.
05/08/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - MET WITH LES FROM CANYON ON THIS SITE AND DISCUSSED WHAT WAS THE PLAN FOR THE INSPECTION OF THE 24 INCH PVC PIPE. I TRIED TO CONTACT THE ENGINEER OF RECORD TO SEE WHAT IS HIS RECOMMENDATIONS FOR THIS SITE, BUT HE WAS UNAVAILABLE AT THIS TIME.
05/09/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) PRESSURE TEST REQUIRED FOR PVC STORM PIPE BEING INSTALLED UNDER THE NEW SERVICE BLDG. 2) 10' OF HEAD PRESSUER FOR 15 MIN - ENSURE NO LEAKING OF JOINTS PRIOR TO COVER. MINIMUM REQUIREMENT
05/07/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSTALL OF 24" PVC ALONG SOUTH SIDE OF SITE, TO INCLUDE STUB-OUTS FOR ROOF DRAINS. 2) ENSURE INSPECTIONS ARE CALLED IN FOR PRESSURE TESTING FOR INSTALL OF PIPE UNDER THE BLDG. WATER TEST W/10' OF HEAD FOR 15 MIN.