Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/17/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 01/17/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 01/17/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 11/01/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor still performing utility work in the empty lot near Oracle Road. Material stock piles on site, barricading installed. Perimeter fencing has been moved closer to the vacant buildings under remodel. Concorde job trailer has been removed.
|
| 09/23/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VFLORES1 - Meeting with Austin with Concorde.
Water harvesting areas along the driveway and the east property line need to be depressed 6 inches below the sidewalk or curb. Stake trees as required. |
| 09/19/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by VFLORES1 - Final grading in the landscape areas have not yet been completed. See water harvesting requirements |
| 12/16/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |