Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP17-0245

Parcel: Unknown


Addresses:

4215 N ORACLE RD

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
01/21/2020 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
01/17/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Pending all other building finals.
01/15/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Accessible parking spaces and ramps. Catch basin has been raised to grade as required. Austin with Concord.
12/23/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by VFLORES1 - Existing catch basin’s have been clean from dirt and debris and have stormwater controls in place.
12/16/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Complete all work shown on your plan. Stabilize all bare dirt areas, clean the mud out of the existing catch basin’s because no controls were provided during construction. Patch the holes in the parking lot. Remove construction debris and materials from site. Austin with Concorde
01/21/2020 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
01/17/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Pending all other building finals.
12/26/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor preparing to raise catch basin and backfill gas line offset in parking areas.