Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 12/16/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 09/19/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by VFLORES1 - Final grading in the landscape areas have not yet been completed. See water harvesting requirements |
| 12/17/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 11/25/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Still need to depress the area it’s been already planted. Other areas are acceptable |
| 11/19/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Denied |
Entered by DMERANZ1 - Courtesy inspection for Austin with Concorde. Depressed areas need to be dug deeper and widened As shown on your water harvesting plans. |
| 09/23/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Continued |
Entered by VFLORES1 - Meeting with Austin with Concorde.
Water harvesting areas along the driveway and the east property line need to be depressed 6 inches below the sidewalk or curb. Stake trees as required. |