Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 03/13/2018 |
SITE - Stormwater Follow-up
|
JV |
Approved |
Entered by JVWINKL1 - No storm water follow up needed |
| 03/01/2018 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - MET WITH THE OWNER OF THE SITE AND DISCUSSED WHAT IS NEEDED FOR THIS SITE NOW AND IN THE FUTURE. TODAY I WILL BE PERFORMING THE PRE-CON, GRADING INTERMEDIATE, AND THE STORMWATER FOLLOWUP ALL AT THE SAME TIME.
IT APPEARS THAT THIS SITE IS NOT LARGE ENOUGH TO REQUIRE A SWPPP, BUT IT IS ADJACENT TO A WASH. THE CONTRACTOR HAS PERFORMED THE GENERAL SITE GRADING FOR THE PAD, AND IS STARTING TO DIG FOR THE FOOTERS OF THE HOUSE. HE WILL BE CALLING THE FOOTER INSPECTION IN UNDER THE COMBO PERMIT FOR THE HOUSE. I HAVE ASKED FOR HIMN TO CALL IN THE STORMWATER FOLLOWUP INSPECTION EVERY TWO WEEKS, IF IT IS NOT NEEDED WE WILL DISCUSS THE INSPECTION TIME FRAME AT THAT TIME. I HAVE ADVISED THEM THAT THEY MAY NOT BE REQUIRED TO HAVE SWPPP CONTROLS IN PLACE, BUT IS THEY ARE I WILL NEED TO SEE A SWPPP PLAN FOR THIS SITE. THEY ARE TO MAKE SURE THAT ALL MATERIAL FROM THIS SITE STAYS ON THIS SITE AND IS KEPT OUT OF THE WASH. |