Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - NPPO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2018 | PDSD Site/Engineering Division - NPPO | DROBERTS | Approved | Entered by DROBERT5 - APPROVED AFTER TALKING TO STEVE SHIELDS, N0THING REQUIRED ON THE SITE FOR THIS DP PERMIT. |