Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP17-0226

Parcel: 10408077E


Addresses:

4670 N CIRCUIT RD

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
11/30/2021 ENGR Engineering Final BBENEDON Approved Entered by VVERA1 - Approved. Change status to final Paver accessible space and Routes have been checked for accessibility compliance
12/18/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - I walk the site with Ron from Concord. Provide no more than 2% slope in accessible spaces, no more than 2% cross slope a new paver walkways. Remove construction materials and debris from parking area. Complete all works on developing package plan reschedule for inspection when ready.