Permit: DP17-0223

Parcel: 107124100


Addresses:

2838 N ESTRELLA AV

Inspection Status: Not Ready

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
10/26/2022 PDSD Engineering Division Pre-Construction SITE Not Ready
01/17/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by CBELL1 - Pete at 250 - 6744 is the owner and the engineer for this property. No slip is required. No an PPO is required. Contractor shall contain all dirt within the site and call for a case in stormwater inspections. Call for grading rebar inspection for the Scupper. Post your address.
03/05/2024 PDSD Engineering Division Pre-Construction SITE Passed Pete with Oracle engineering.
Project is about to start. Eight residential units. Post address schedule inspections biweekly. Follow all plan details. Provide Stormwater controls has needed. SWPPP not required.
08/29/2025 PDSD Engineering Division Pre-Construction SITE Passed On-site pre-construction meeting is complete. Stormwater measures are in place as needed. No NPPO for this site.