Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP17-0216
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by PAHUMAD1 - APPROVED, ALL OTHER INSPECTIONS TO BE DONE UNDER THE FINAL GRADING INSPECTION. |
| 08/14/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No grading activity at this time all work is being done on houses. |
| 06/18/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading activity working on houses. |
| 05/06/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - No grading activity at this time. |
| 05/01/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Provide approved COT drawings for all changes to Development package site plans. |
| 02/04/2020 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - Check ramps that were repaired over the weekend slopes within compliance. |
| 01/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with Concrete contractor went over sidewalks and curb ramps that were out. |
| 01/13/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Working on house pads no grading activity at this time. Wanted to check slopes on sidewalks debris construction equipment on sidewalks. |
| 01/08/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Checking sidewalks on south end of site. |
| 10/11/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - No grading activity at this time |
| 11/14/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH MIKE BRAVIN ON SITE WENT OVER SOME RCP STORM WATER PIPING THAT HE HAD INSPECTED . |
| 11/05/2018 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - MET WITH BORDERLAND ON SITE ABOUT RCP PIPING THAT THEY ARE INSTALLING TO SEE IF IPA OR PDSD IS ODING INSPECTIONS. |
| 06/04/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING WORK ON PADS AND ROADS AT THIS TIME. |
| 05/30/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ON SITE. |
| 11/02/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by PAHUMAD1 - APPROVED |
| 11/02/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by PAHUMAD1 - APPROVED |
| 02/07/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by DMERANZ1 - SITE VISIT ONLY MET WITH THE DEVELOPER AND DISCUSSED THE ISSUES THAT WE ARE HAVING WITH THE SITE |
| 02/16/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
| 11/02/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by PAHUMAD1 - APPROVED |
| 12/19/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Sidewalk Scupper at Curve on most East Street |
| 12/14/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Sidewalk Scupper rebar install / detail 2005.5 at basins number 2 3 and 4 okay. |
| 12/04/2018 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by RLEDONN1 - HEAD WALLS WITH RCP ON EAST SIDE OF SITE OK ONLY. FOR REBAR. |
| 12/03/2018 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by CBELL1 - Provide a proof plan in detail for inspection |