Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP17-0216
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/02/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by PAHUMAD1 - APPROVED, ALL OTHER INSPECTIONS TO BE DONE UNDER THE FINAL GRADING INSPECTION. |
08/14/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No grading activity at this time all work is being done on houses. |
06/18/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading activity working on houses. |
05/06/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - No grading activity at this time. |
05/01/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Provide approved COT drawings for all changes to Development package site plans. |
02/04/2020 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - Check ramps that were repaired over the weekend slopes within compliance. |
01/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with Concrete contractor went over sidewalks and curb ramps that were out. |
01/13/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Working on house pads no grading activity at this time. Wanted to check slopes on sidewalks debris construction equipment on sidewalks. |
01/08/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Checking sidewalks on south end of site. |
10/11/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - No grading activity at this time |
11/14/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH MIKE BRAVIN ON SITE WENT OVER SOME RCP STORM WATER PIPING THAT HE HAD INSPECTED . |
11/05/2018 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - MET WITH BORDERLAND ON SITE ABOUT RCP PIPING THAT THEY ARE INSTALLING TO SEE IF IPA OR PDSD IS ODING INSPECTIONS. |
06/04/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING WORK ON PADS AND ROADS AT THIS TIME. |
05/30/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ON SITE. |
11/02/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by PAHUMAD1 - APPROVED |
11/02/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by PAHUMAD1 - APPROVED |
02/07/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by DMERANZ1 - SITE VISIT ONLY MET WITH THE DEVELOPER AND DISCUSSED THE ISSUES THAT WE ARE HAVING WITH THE SITE |
02/16/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
11/02/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by PAHUMAD1 - APPROVED |
12/19/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Sidewalk Scupper at Curve on most East Street |
12/14/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Sidewalk Scupper rebar install / detail 2005.5 at basins number 2 3 and 4 okay. |
12/04/2018 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by RLEDONN1 - HEAD WALLS WITH RCP ON EAST SIDE OF SITE OK ONLY. FOR REBAR. |
12/03/2018 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by CBELL1 - Provide a proof plan in detail for inspection |