Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP17-0215
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
05/06/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE CHECKING FOR ACTIVITY/BUILDING BURNT DOWN |
03/21/2023 | ENGR Grading Final | Partial Pass | MET THE CONTRACTOR ON SITE AND LOOKED AT THE TRASH ENCLOSURE FOR THE PLACEMENT OF THE GROUT. MINOR ADDITION OF REBAR IN TWO LOCATIONS WILL BE ADDED PRIOR TO THE PLACEMENT OF THE GROUT. THE CONTRACTOR WILL SCHEDULE ADDITIONAL INSPECTION FOR THE FLOOR SLAB ONCE THE REBAR PLACEMENT HAS BEEN COMPLETED. | |
04/06/2023 | ENGR Grading Final | Not Ready | Complete all work as shown on the approved plans for this site prior to calling in this final inspection | |
04/06/2023 | ENGR Grading Final | Not Ready | Complete all work is shown on the approved plans prior to calling this in for a final inspection | |
04/06/2023 | ENGR Grading Final | Not Ready | Complete all work on this site per the approved plans prior to scheduling this final inspection | |
04/07/2023 | ENGR Grading Final | Not Ready | Met with Mike and looked over the site to see what was needed to be completed in the next few weeks. They will be performing they’re paving on the week of the 20th this month and should be ready for a final inspection the following week. | |
04/07/2023 | ENGR Grading Final | Partial Pass | Complete all work is shown on the approved plans prior to calling this inspection in for a final | |
04/07/2023 | ENGR Grading Final | Partial Pass | Complete everything on the side as shown on the approved plans prior to calling this in for a final inspection | |
05/04/2023 | ENGR Grading Final | Not Ready | COMPLETE HYDROSEEDING OF DISTURBED SOILS | |
05/04/2023 | ENGR Grading Final | Partial Pass | Complete hydroseeding | |
05/04/2023 | ENGR Grading Final | Partial Pass | Complete the hydroseeding on disturbed soil | |
05/12/2023 | ENGR Grading Final | Passed | ||
05/12/2023 | ENGR Grading Final | Passed | ||
05/12/2023 | ENGR Grading Final | Passed |