Permit: DP17-0215

Parcel: 13002003A


Addresses:

3000 E 22ND ST


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP17-0215

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
05/06/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE CHECKING FOR ACTIVITY/BUILDING BURNT DOWN
03/21/2023 ENGR Grading Final Partial Pass MET THE CONTRACTOR ON SITE AND LOOKED AT THE TRASH ENCLOSURE FOR THE PLACEMENT OF THE GROUT. MINOR ADDITION OF REBAR IN TWO LOCATIONS WILL BE ADDED PRIOR TO THE PLACEMENT OF THE GROUT. THE CONTRACTOR WILL SCHEDULE ADDITIONAL INSPECTION FOR THE FLOOR SLAB ONCE THE REBAR PLACEMENT HAS BEEN COMPLETED.
04/06/2023 ENGR Grading Final Not Ready Complete all work as shown on the approved plans for this site prior to calling in this final inspection
04/06/2023 ENGR Grading Final Not Ready Complete all work is shown on the approved plans prior to calling this in for a final inspection
04/06/2023 ENGR Grading Final Not Ready Complete all work on this site per the approved plans prior to scheduling this final inspection
04/07/2023 ENGR Grading Final Not Ready Met with Mike and looked over the site to see what was needed to be completed in the next few weeks. They will be performing they’re paving on the week of the 20th this month and should be ready for a final inspection the following week.
04/07/2023 ENGR Grading Final Partial Pass Complete all work is shown on the approved plans prior to calling this inspection in for a final
04/07/2023 ENGR Grading Final Partial Pass Complete everything on the side as shown on the approved plans prior to calling this in for a final inspection
05/04/2023 ENGR Grading Final Not Ready COMPLETE HYDROSEEDING OF DISTURBED SOILS
05/04/2023 ENGR Grading Final Partial Pass Complete hydroseeding
05/04/2023 ENGR Grading Final Partial Pass Complete the hydroseeding on disturbed soil
05/12/2023 ENGR Grading Final Passed
05/12/2023 ENGR Grading Final Passed
05/12/2023 ENGR Grading Final Passed