Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 08/05/2021 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by RSALDAT1 - 9183 |
| 06/08/2018 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - THERE ARE NO CONCERNS AT THIS TIME FOR THE STORMWATER ASPECTS ON THIS SITE. |
| 04/18/2018 |
SITE - Stormwater Follow-up
|
DROBERT5 |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME. THE CONTRACTOR IS ADJUSTING THE WADDLE AT THE SOUTHWEST QUADRANT TO INSTALL A GRADER DITCH. ALL WORK WILL BE COMPLETED BY THE END OF THE DAY |
| 03/13/2018 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME |
| 01/23/2018 |
SITE - Stormwater Follow-up
|
DROBERT5 |
Continued |
Entered by DROBERT5 - THE CREWS HAVE INSTALLED THE CONTROLS ALONG THE NORTH AND WEST SIDES OF THIS SITE, AND ARE USING MILLING MATERIALS FOR THEIR TRACKOUT MATERIAL. I HAVE ADVISED THEM THAT THEY NEED TO MONITOR THE STREETS FOR MUD AND OTHER DEBRIS FROM THIS SITE. CURRENTLY THEY HAVE SOM TRACKOUD ON BENTLEY AND NEED TO CLEAN IT UP BEFORE THEY LEAVE FOR THE DAY. THE SITE WILL BE RECHECKED EITH LATER TODAY OR TOMORROW TO VERIFY THAT THE SWEEPER CLEANED UP ALL OF THE MATERIAL FROM THIS SITE. |