Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/05/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - 9183 |
| 01/02/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by CBELL1 - Notes for final grading under engineering final. |
| 12/19/2018 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Provide approved construction documents. Complete all the work shown on the approved plans.
Two houses and the associated walkways have been constructed at this time. There are piles of construction materials on site |
| 06/08/2018 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THIS INSPECTION, ALL COMMENTS WILL BE MADE IN THE INTERMEDIATE GRADING COMMENTS. |
| 08/05/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - 9183 |
| 01/02/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by CBELL1 - Uncovered Dain in walls on Southside of site per keynote number 2 on page 5. Complete all sidewalks on private Street. Sidewalks cross slopes okay for Lots 3 and 4 only. complet tree staking per details on page 13 of 15. complet all work on ap plans. |
| 12/19/2018 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Provide approved construction documents. Complete all the work shown on the approved plans.
Two houses and the associated walkways have been constructed at this time. There are piles of construction materials on site |