Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/26/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 11/04/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Check accessible parking discuss directions |
| 10/28/2019 |
ENGR Engineering Final
|
BBENEDON |
Denied |
Entered by DMERANZ1 - I met Charlie with ace remodeling at 850-0222.
Correct slope of accessible parking space. Slope exceeds 2.3%
Depressed water harvesting/landscaped areas as shown on approved civil drawings located in PRO. Inspector has no issues that would prevent temporary certificate of occupancy, provided that area requiring rework is barricaded as needed. |