Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/08/2020 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RSALDAT1 - Approved. |
| 11/26/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON HOUSE PADS. |
| 07/13/2020 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RSALDAT1 - Approved. Certification letter for all grading and drainage and basin Has been provided by engineer of record and is on site with owners rep Chris Ginter. |
| 06/16/2020 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready complete all work on approve plans and notes from inspections.
|
| 06/15/2020 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by RSALDAT1 - PARTIAL AT THIS TIME, THE SIDEWALKS NEED TO BE CHECKED FOR COMPLIANCY PRIOR TO A FULL RELEASE OF THE SITE, NO WORK ON THE SITE AT THIS TIME. THIS SITE WILL BE RESCHEDULE FOR INSPECTION ON 6/16/2020 TO VERIFY ALL THE SIDEWALKS AND WHEELCHAIR ACCESS RAMPS. |
| 05/30/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Complete all work on approved plans before calling for grading final. |