Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/04/2018 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/17/2018 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - FIND NOTES AT ACTIVITY #T17CM05792. |
| 08/16/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - |
| 08/15/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - |
| 03/27/2018 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - COMPLET NOTES 12-14 - 2017. |
| 12/14/2017 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - COMPLETE THE WORK ON THIS SITE AS SHOWN ON THE APPROVED PLANS. THE TRASH ENCLOSURE PER OUR STANDARD DETAILS AND HAVE THE ENCLOSURE APPROVED BY THE ENVIRONMETAL DEPARTMENT PRIOR TO SCHEDULING FOR THE FINAL INSPECTION OF THIS SITE. OK FOR TCO |
| 12/13/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |