Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 04/26/2022 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by NGARCIA3 - PARTIAL, MET WITH GARY THE OWNER/CONTRACTOR FOR THIS SITE AND DISCUSSED THE SITE AND THE NON-PERMITTED RETAINING WALLS THAT WERE CONSTRUCTED BUT NOT INSPECTED. ALSO HE WILL NEED TO HAVE CONVERSATIONS ABOUT THE ROCK RIP RAP THAT HAS BEEN PLACED NOT PER THE APPROVED PLANS. I HAVE ASKED THAT HE CONTACT NICK ROSS AN STEPHEN BLOOD TO DISCUSS WHAT WILL BE REQUIRED TO CLOSE OUT THIS PROJECT AT A LATER DATE. I HAVE ADVISED HIM NOT TO DO ANY MORE WORK ADJACENT TOO THE EXISTING FINISHED WALLS. HE WILL BE WORKING ON THE 3RD WALL IN THE COMING WEEKS, AND WILL HAVE THIS INSPECTED AT EVERY PHASE, AND WILL PHOTOGRAPH AS HE HAS DONE IN THE PAST. HE WILL BE SENDING ME THE PHOTOS THAT WE LOOKED AT TODAY SO I CAN SHOW THEM TO NICK ROSS AND STEPHEN BLOOD LATER THIS WEEK. |
| 04/22/2022 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - PARTIAL, TH STRUCTURE HAS BEEN CONSTRUCTED AND 50% OF THE SITE IS COMPLETED AT THIS TIME. THE RETAINING WALLS AT VARIOUS LOCATIONS HAVE BEEN CONSTRUCTED, BUT APPEAR TO NOT HAVE BEEN PERMITTED. THE OWNER OF THE SITE WILL BE WORKING WITH ALEX FROM CADMAN TO GET THE PERMITS ISSUED IF THEY ARE REQUIRED. ALSO THE ROCK RIP RAP CALLED OUT ON THIS SITE HAS NOT BEEN COMPLETED PER THE APPROVED PLANS, MISSING GROUT BASE OR FILTER FABRIC AT VARIOUS LOCATIONS. THIS INSPECTION WILL BE RESCHEDULED FOR THE WEEK OF MAY 20TH SO THAT THEY WILL HAVE TIME TO MAKE SOME CORRECTIONS TO THE PLANS OR THE SITE. |
| 04/22/2022 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by NGARCIA3 - PARTIAL, TH STRUCTURE HAS BEEN CONSTRUCTED AND 50% OF THE SITE IS COMPLETED AT THIS TIME. THE RETAINING WALLS AT VARIOUS LOCATIONS HAVE BEEN CONSTRUCTED, BUT APPEAR TO NOT HAVE BEEN PERMITTED. THE OWNER OF THE SITE WILL BE WORKING WITH ALEX FROM CADMAN TO GET THE PERMITS ISSUED IF THEY ARE REQUIRED. ALSO THE ROCK RIP RAP CALLED OUT ON THIS SITE HAS NOT BEEN COMPLETED PER THE APPROVED PLANS, MISSING GROUT BASE OR FILTER FABRIC AT VARIOUS LOCATIONS. THIS INSPECTION WILL BE RESCHEDULED FOR THE WEEK OF MAY 20TH SO THAT THEY WILL HAVE TIME TO MAKE SOME CORRECTIONS TO THE PLANS OR THE SITE. |
| 05/09/2022 |
ENGR Grading Final |
DROBERT5 |
Approved |
Entered by DROBERT5 - |
| 05/09/2022 |
ENGR Grading Final |
DROBERT5 |
Approved |
Entered by DROBERT5 - |
| 03/09/2023 |
ENGR Grading Final |
|
Passed |
|
| 11/10/2022 |
ENGR Grading Final |
|
Complete (Recurring) |
NO COMMENTS |
| 11/09/2022 |
ENGR Grading Final |
|
Not Ready |
Near retaining wall inspection when ready |
| 12/16/2022 |
ENGR Grading Final |
|
Complete (Recurring) |
LOOKED AT THE WALL FOOTER THAT THE CONTRACTOR WILL BE POURING NEXT WEEK. I HAVE ADVISED THEM TO LET ME KNOW WHEN THE FOOTER IS COMPLETED AND TO SEND ME PHOTOS FOR APPROVAL |