Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/20/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SITE IS > ARCE THEREFORE A SWPPP IS REQUIRED
2) POST A COPY OF YOUR NOI ON SITE
3) PERFORM SELF INSPECTIONS EVERY 14 DAYS AND DOCUMENT THEM
4) STABILIZED CONSTRUCTION ENTRANCE, CONCRETE WASH OUT AND SEDIMENT CONTROLS ARE IN PLACE. ENSURE YOU MAINTAIN THROUGHOUT CONSTRUCTION.
5) SWEEP UP TRACKING OFF ADJACENT ROADWAYS ROUTINELY
6) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPE WORK PRIOR COVERING |