Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 08/04/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 07/13/2017 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - SITE STORMWATER IS FUNCTIONING AT PLANNED, NO CONCERNS AT THIS TIME |
| 07/11/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PRIOR TO C OF O AND FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD AND A APPROVED PLAN SHOWING WHAT WAS BUILT
2) ENSURE COMPLIANCE WITH YOUR SWPPP THROUGHOUT CONSTRUCTION
3) CALL FOR INSPECTION FOR INSTALL OF 8' STORM PIPE |
| 06/29/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSPECTED INSTALL OF UDERGROUND RETENTION PIPING
2) PICTURES TAKEN, NO SIGNIFICANT CONCERNS AT THIS TIME
3) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAY |
| 06/26/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PRELIMINARY PICTURES TAKEN OF 48" CMP INSTALL
2) PROVIDE MANUFACTURER SPEC SHEET AND INSTALL INSTRUCTIONS FOR PIPE. NO DETAILS SHOWN ON THE APPROVED PLANS
3) PRIOR TO FIANL APPROVAL, PROVIDE A CERT STATEMNET FROM THE ENG OF RECORD.
4) NO SIGNIFICANT STORM WATER CONERNS AT THIS TIME |