Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP17-0058
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED 2) NOI POSTED # AZCON 67588 3) A STABILIZED CONSTRUCTION ENTRANCE IS INSTALLED 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 5) ENSURE A CONCRETE WASH IS INSTALLED AND USED WHEN APPLICABLE |
| 08/01/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Violation | Entered by DROBERT5 - 1) SITE IS IN NON-COMPLIANCE WITH AZPDES AND THE COT COT STORM WATER ORDINANCE. 2) PROVIDE AN NOI AND POST ON SITE 3) PROVIDE A SWPPP ON SITE AND IMPLEMENT IT 4) COMPLY WITH IN 10 WORKING DAYS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION 5) CALL FOR FOLLOW UP INSPECTION WHEN IN COMPLIANCE |