| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2018 | ENGR Engineering Final | BBENEDON | Approved | Entered by CBELL1 - |
| 12/06/2018 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by CBELL1 - Letter provided from Wilder Landscape Architects. Complete the previously noted Corrections |
| 11/20/2018 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by CBELL1 - Provide a letter from the engineer to verifiy grading. Correct the hump in the accessible parking drop-off Zone where it meets the sidewalk. Complete the Landscaping. Provide the required depth of the Basin along the north parking area. Provide ground cover on all surfaces as shown on the plan. Remove remaining construction debris. Inspector has no safety concerns that would prevent the use of the completed areas. |
| 10/11/2017 | ENGR Engineering Final | MRUSSO | Denied | Entered by DROBERT5 - NOT READY FOR INSPECTION |
| 12/13/2018 | ENGR Engineering Final | BBENEDON | Approved | Entered by CBELL1 - |
| 12/06/2018 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by CBELL1 - Schedule meeting with property managers Paving contractor, Ron and myself. Again please correct the hum at the accessible drop-off parking Zone where it meets the sidewalk. Slope exceeds 2%. Letter provided from Jennifer Patton Wilder Landscape Architects confirming that Harvest basins are per plan, soils have been protected, and landscape areas meet the requirements of the approved plans. |
| 11/20/2018 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by CBELL1 - Provide a letter from the engineer to verifiy grading. Correct the hump in the accessible parking drop-off Zone where it meets the sidewalk. Complete the Landscaping. Provide the required depth of the Basin along the north parking area. Provide ground cover on all surfaces as shown on the plan. Remove remaining construction debris. Inspector has no safety concerns that would prevent the use of the completed areas. |