Permit: DP17-0058

Parcel: 10409127K


Addresses:

801 W LIMBERLOST DR


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP17-0058

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
12/13/2018 ENGR Engineering Final BBENEDON Approved Entered by CBELL1 -
12/06/2018 ENGR Engineering Final BBENEDON Partial Approval Entered by CBELL1 - Letter provided from Wilder Landscape Architects. Complete the previously noted Corrections
11/20/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Provide a letter from the engineer to verifiy grading. Correct the hump in the accessible parking drop-off Zone where it meets the sidewalk. Complete the Landscaping. Provide the required depth of the Basin along the north parking area. Provide ground cover on all surfaces as shown on the plan. Remove remaining construction debris. Inspector has no safety concerns that would prevent the use of the completed areas.
10/11/2017 ENGR Engineering Final MRUSSO Denied Entered by DROBERT5 - NOT READY FOR INSPECTION
12/13/2018 ENGR Engineering Final BBENEDON Approved Entered by CBELL1 -
12/06/2018 ENGR Engineering Final BBENEDON Partial Approval Entered by CBELL1 - Schedule meeting with property managers Paving contractor, Ron and myself. Again please correct the hum at the accessible drop-off parking Zone where it meets the sidewalk. Slope exceeds 2%. Letter provided from Jennifer Patton Wilder Landscape Architects confirming that Harvest basins are per plan, soils have been protected, and landscape areas meet the requirements of the approved plans.
11/20/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Provide a letter from the engineer to verifiy grading. Correct the hump in the accessible parking drop-off Zone where it meets the sidewalk. Complete the Landscaping. Provide the required depth of the Basin along the north parking area. Provide ground cover on all surfaces as shown on the plan. Remove remaining construction debris. Inspector has no safety concerns that would prevent the use of the completed areas.