Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 02/11/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Winter projects off of Gardiner Lane. Plan indicates .967 acre. Small warehouse building with no traction closure shown on plan. Site has not yet been graded, there are no walkways installed at this time. Site has large piles of rocks and debris. Please provide track out protection at main entrance. A right of way permit will be required for the sidewalk along runway Drive. There’s no superintendent on the site |
| 03/24/2021 |
ENGR Grading Final |
BBENDON |
Continued |
Entered by RSALDAT1 - Continued. No construction activity at this time. Site is being used for material and debris storage for outlaw excavating.
|
| 03/23/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. No change since last inspection. No activity on site |