Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP17-0048
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/16/2018 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND INSPECTION RESULTS. 2) MAINTAIN STORM WATER CONTROLS THROUGHOUT CONSTRUCTION 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS 4) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS 5) INSTALL A CONCRETE WASH OUT 6) POST A COPY OF YOUR NOI 7) ELIMINATE STORM CONTROLS ALONG THE SOUTH AND EAST PERIMETER OF SITE. HOWEVER CONTROLS MAY NEED TO BE ADDED IF NECESSARY. 8) CALL FOR INSPECTION FOR ANY SITE/LANDSCAPING/GRADING CONCERNS |