Permit: DP17-0019

Parcel: 117131560


Addresses:

192 S STONE AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP17-0019

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/31/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 - Catch basins and connections of HDPE into RCP are OK based on documentation from the engineer of record. Thank you
12/20/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CBELL1 - Storm drains have been tied together below grade at canopy location.
12/18/2018 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Underground storm water piping on North side of building purple highlights on approved plans page 4 of 26.
10/01/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CMURPHY1 - 2 X 3 catch Basin with connection to storm drain and roof drain connection to exterior storm drain on West Side okay to cover. Thank you Brian
09/21/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - HIGH LIGHTS ON PAGE #5.
09/20/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - INSPECTION PER HIGHLIGHTS ON PAGE 5 OF 26.
09/19/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE 5 OF 26 STORM WATER PIPING.
09/05/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE.
08/30/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
09/09/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
05/01/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Stairs along the north side of the building as shown in the development package and further detail in the building plans OK.
09/09/2019 ENGR Grading Final DROBERTS Approved Entered by KROBLES1 -
09/09/2019 ENGR Grading Final DROBERTS Approved Entered by KROBLES1 -
06/21/2017 ENGR Grading Final DROBERTS Correction Required Entered by DROBERT5 - CHECKED THE SITE TO VERIFY WHAT WORK HAS STARTED, DEMOLITION OF THE SITE HAS ALMOST BEEN COMPLETED EXCEPT FOR SOM MINOR HAULOFF OF EXCESS MATERIAL. I WILL GO BY THE SITE TOMORROW TO MEET WITH THE CONTRACTOR.
06/22/2017 ENGR Grading Final DROBERTS Correction Required Entered by DROBERT5 - MET WITH MARIO FROM DIVERSIFIED AND ASKED HIM TO START SCHEDULING THE INSPECTIONS FOR THE DEVELOPMENT PACKAGE THAT IS ACTIVE AT THIS TIME. HE WILL BE SCHEDULING THE PRE-CONSTRUCTION FOR EITHER TOMORROW 6/23/2017 OR THE FIRST PART OF NEXT WEEK. THEY HAVE INSTALLED SOME OF THE STORMWATER CONTROLS (BMP's) AROUND THE PERIMETER OF THE SITE AND HAVE A SECTION OF TRACKOUT ROCK TO ALLOW ACCESS TO THE SITE FROM THE STREET. I WILL HAVE RON CHECK THE PLANS AND WITH THE ENGINEER OF RECORD FOR THE PROPER LOCATION OF THE ENTRANCE INTO THE SITE. CURRENTLY THEY ARE USING THE WHEELCHAIR ACCESS RAMP LOCATED AT THE NORTHEAST CORNER OF THE SITE, THIS APPEARS THAT IT IS A SAFETY ISSUE FOR PEDESTRIANS CROSSING THE STREETS.