Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP17-0019
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by CBELL1 - Catch basins and connections of HDPE into RCP are OK based on documentation from the engineer of record. Thank you |
12/20/2018 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Storm drains have been tied together below grade at canopy location. |
12/18/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Underground storm water piping on North side of building purple highlights on approved plans page 4 of 26. |
10/01/2018 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CMURPHY1 - 2 X 3 catch Basin with connection to storm drain and roof drain connection to exterior storm drain on West Side okay to cover. Thank you Brian |
09/21/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - HIGH LIGHTS ON PAGE #5. |
09/20/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTION PER HIGHLIGHTS ON PAGE 5 OF 26. |
09/19/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE 5 OF 26 STORM WATER PIPING. |
09/05/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE. |
08/30/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
09/09/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
05/01/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Stairs along the north side of the building as shown in the development package and further detail in the building plans OK. |
09/09/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by KROBLES1 - |
09/09/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by KROBLES1 - |
06/21/2017 | ENGR Grading Final | DROBERTS | Correction Required | Entered by DROBERT5 - CHECKED THE SITE TO VERIFY WHAT WORK HAS STARTED, DEMOLITION OF THE SITE HAS ALMOST BEEN COMPLETED EXCEPT FOR SOM MINOR HAULOFF OF EXCESS MATERIAL. I WILL GO BY THE SITE TOMORROW TO MEET WITH THE CONTRACTOR. |
06/22/2017 | ENGR Grading Final | DROBERTS | Correction Required | Entered by DROBERT5 - MET WITH MARIO FROM DIVERSIFIED AND ASKED HIM TO START SCHEDULING THE INSPECTIONS FOR THE DEVELOPMENT PACKAGE THAT IS ACTIVE AT THIS TIME. HE WILL BE SCHEDULING THE PRE-CONSTRUCTION FOR EITHER TOMORROW 6/23/2017 OR THE FIRST PART OF NEXT WEEK. THEY HAVE INSTALLED SOME OF THE STORMWATER CONTROLS (BMP's) AROUND THE PERIMETER OF THE SITE AND HAVE A SECTION OF TRACKOUT ROCK TO ALLOW ACCESS TO THE SITE FROM THE STREET. I WILL HAVE RON CHECK THE PLANS AND WITH THE ENGINEER OF RECORD FOR THE PROPER LOCATION OF THE ENTRANCE INTO THE SITE. CURRENTLY THEY ARE USING THE WHEELCHAIR ACCESS RAMP LOCATED AT THE NORTHEAST CORNER OF THE SITE, THIS APPEARS THAT IT IS A SAFETY ISSUE FOR PEDESTRIANS CROSSING THE STREETS. |