Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 03/19/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - CONTINUE NOT READY MISSING WHEEL STOPS |
| 06/23/2017 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - MET WITH THE ELECTRICAL CONTRACTOR ON SITE, THE PRIME CONTRACTOR IS NOT ON SITE AT THIS TIME.
I TRIED CONTACTING JESSE PATTERSON WITH TORTILLA HOMES AT 520-730-7982 BUT ONLY WAS ABLE TO LEAVE A MESSAGE FOR HIM TO CALL. I ADVISED HIM IN THE MESSAGE THAT HE NEEDS TO SCHEDULE THE INSPECTIONS FOR THIS DEVELOPMENT PACKAGE OR I WILL LOCK THE PERMITS ON THIS PERMIT AND THE COMBO PERMIT. |
| 06/22/2017 |
ENGR Grading Final |
DROBERTS |
Correction Required |
Entered by DROBERT5 - THE CONTRACTOR HAS STARTED THE WORK ON THIS SITE, CURRENTLY THE STRUCTURE HAS BEEN COMPLTED VERTICALLY, AND HAVE APPLIED THE STUCCO TO THE STRUCTURE. CURRENTLY THE CREWS ARE WORKING ON THE INSTALLATION OF THE ROOFING TILES, THEY HAVE THE NAILING STRIPS INSTALLED AND THE TILES LOCATED ON THE ROOF. THERE IS NO ONE ON SITE AT THIS TIME. I WILL RESCHEDULE THIS WORK FOR THE FIRST PART OF NEXT WEEK SO THAT MIKE CAN MEET WITH THE CONTRACTOR AND GET THE PERMIT INSPECTIONS UP TO DATE. |