Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 05/28/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - Continued. Project is ongoing Although no activity on site at this time
|
| 04/27/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - Continued. Building construction in progress. Site has been rough graded only. |
| 03/19/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - Continued. Project is still under construction structure has been built grading and landscaping, has not been completed. |
| 11/29/2019 |
ENGR Grading Final |
DROBERTS |
Denied |
Entered by DMERANZ1 - THE FLOOR AND THE STEM WALL HAVE BEEN CONSTRUCTED PRIOR TO THIS DATE. THE CONTRACTOR HAS DESTROYED 1 LARGE SAGUARO CACTUS AND HAS PARTIALLY BURIED 2OTHER SMALLER SAGUARO CACTUS. THIS SITE NEEDS TO BE BLOCKED TO PREVENT ANY OTHER ACTIVITY ON IT. |
| 06/22/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION ON SITE.
GRADE STAKES IN PLACE |
| 08/26/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continue. Building appears to be complete. Site has no stabilization. Erosion present. |