Permit: DP16-0241

Parcel: 10714198A


Addresses:

2525 N BALBOA AV


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP16-0241

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/19/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 - Received certification letter from Richard Macias, with Cypress civil development, stating that the site improvements are in substantial conformance to the approved improvement plans.
08/14/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Completed previously noted requirements. Andy with Canyon builders, Depress landscaped areas as shown on your site and grading plans. Currently the depressed areas are not as wide as indicated. Complete the riprap shown. Provide a hard surface for short term bicycle parking areas.
07/03/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Andy Wilson is requesting a temporary C of O for funding. Engineering has no issues preventing a temporary C of O. Provide a letter of certification for final grading. Complete all work shown on your development package permit. Depress all landscaping areas 6 inches below curb and lower than sidewalk scupper invert. Trim all cleanouts, install landscaping, bicycle racks etc. Complete work in the right of way. Re-install accessible sign post footings as shown on plan detail.
07/01/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Inspection for pre-grout.
08/20/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
08/19/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Provide the required clearance around the bicycle parking, and complete the masonry at the handrail.
08/14/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Completed previously noted requirements. Andy with Canyon builders, Depress landscaped areas as shown on your site and grading plans. Currently the depressed areas are not as wide as indicated. Complete the riprap shown. Provide a hard surface for short term bicycle parking areas.
07/03/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Andy Wilson is requesting a temporary C of O for funding. Engineering has no issues preventing a temporary C of O. Provide a letter of certification for final grading. Complete all work shown on your development package permit. Depress all landscaping areas 6 inches below curb and lower than sidewalk scupper invert. Trim all cleanouts, install landscaping, bicycle racks etc. Complete work in the right of way. Re-install accessible sign post footings as shown on plan detail.