Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP16-0229
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/22/2017 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
06/07/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - |
06/22/2017 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
06/07/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - INSTALL HANDRAILING ON RAMP PER ICC CHAPTER #5 505.2. REPAIR ASPHALT WALKWAY FROM RAMP TO CAR WASH. |