Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP16-0213

Parcel: 11708164B


Addresses:

501 W 18TH ST


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP16-0213

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
04/12/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
04/12/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
02/15/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - NO WORK ON THIS SITE AT THIS TIME DUE TO THE DAYS RAINS, WORK WILL EITHER CONTINE TOMORROW OR THE FIRST OF NEXT WEEK.
02/12/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC NO CONCERNS AT THIS TIME.
02/01/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON FINAL GRADING TO START PAVING.
01/30/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON SIDE WALKS AND CURBING.
01/23/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET GC ON SITE WENT OVER SITE PLAN AND ADDING SWPPP CONTROLS AT CATCH BASIN. AND TALKED ABOUT ROOF DRAIN GOING OVER SIDE WALK.
12/14/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
12/06/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
10/27/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
10/23/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
09/22/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
09/06/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
08/07/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GRADING ACTIVITY INPARKING AREA.
08/01/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER AP PLANS.
07/31/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING IN RIGHT OF WAY ON SIDE WALKS.
07/28/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE.
07/26/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
04/12/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
02/15/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - I INSPECTED THE RETAINAG WALL FORMS AND THE SEAT WALL FORMS, THESE HAVE BEEN APPROVED SO THAT THEY CAN BE POURED AFTER THE RAINS HAVE STOPPED
02/09/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - INSPECTED THE REBAR FOR THE RETAINING WALL AND THE SEAT WALLS(5) OK TO POUR THE FOOTERS. REINSPECTION OF THE REMAINING AREAS TO BE DONE PRIOR TO POURING THE UPPER PORTIONS OF THE WALLS.
04/12/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
07/12/2017 ENGR Grading Final REDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
07/10/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.