Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/29/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI ON SITE
3) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP
5) INSTALL AND USE A STABILIZED CONSTRUCTION ENTRANCE
6) INSTALL A CONCRETE WASH OUT
7) SWEEP UP TRACKED SOIL ROUTINELY
8) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING, OR STORM WATER CONCERNS |