Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/04/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 12/04/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 12/04/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 12/04/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 09/01/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - SUBGRADE SET, PREP FOR PAVING THIS WEEK |
| 08/16/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 -
POC ERIC 861-9755
1) TRASH ENCLOSURE DETAIL ON APPROVED PLANS NO PER COT STD DETAIL 6-0.10.
2) TRASH ENCLOSURE RE-BAR VERT ADDED - OK TO GROUT
3) PRIOR TO FINAL APPROVAL FOR GRADING, PROVIDE A CERT STATEMENT FRO THE ENG OF RECORD.
4) MINIMIZE SOIL FROM CONSTRUCTION RUN OFF AT DISCHAGE POINT. ADD SEDIMENT CONTROLS. |
| 08/09/2017 |
ENGR Grading Final |
MRUSSO |
Correction Required |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS ARE IN PLACE ALONG THE NORTH SIDE OF THE SITE; HOWEVER STORM WATER REG WILL CHANGE AS CONSTRUCTION ADVANCES
2) LOOKED AT A SECTION OF STORM CHANNEL ALONG EAST SIDE OF SITE - SHOTCRETE THIS WEEK
3) CALL FOR RE-INSPECTIOBN PRIOR TO COVERING STORM PIPE AND CATCH BASINS |