Permit: DP16-0212

Parcel: Unknown


Addresses:

1040 S HARRISON RD

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
09/01/2017 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 - SEDIMENT CONTROLS IN PLACE
08/16/2017 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) TRASH ENCLOSURE DETAIL ON APPROVED PLANS NO PER COT STD DETAIL 6-0.10. 2) TRASH ENCLOSURE RE-BAR VERT ADDED - OK TO GROUT 3) PRIOR TO FINAL APPROVAL FOR GRADING, PROVIDE A CERT STATEMENT FRO THE ENG OF RECORD. 4) MINIMIZE SOIL FROM CONSTRUCTION RUN OFF AT DISCHAGE POINT. ADD SEDIMENT CONTROLS.
08/09/2017 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by DROBERT5 - 1) SEDIMENT CONTROLS ARE IN PLACE ALONG THE NORTH SIDE OF THE SITE; HOWEVER STORM WATER REG WILL CHANGE AS CONSTRUCTION ADVANCES 2) LOOKED AT A SECTION OF STORM CHANNEL ALONG EAST SIDE OF SITE - SHOTCRETE THIS WEEK 3) CALL FOR RE-INSPECTIOBN PRIOR TO COVERING STORM PIPE AND CATCH BASINS