Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/28/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT ENTRANCE TO THE SITE
3) PERFORM STORM WATER SELF INSP PER YOUR SWPPP
4) INSTALL A CONCRETE WASH OUT
5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
6) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS |