Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP16-0202

Parcel: 117121930


Addresses:

40 E CONGRESS ST


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP16-0202

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/21/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
03/12/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Corrective actions required by Dave Roberts and January 2019.
01/21/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
05/10/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THIS INSPECTION WAS SCHEDULED FOR AN AREA THAT IS WITHIN THE PUBLIC RIGHTS OF WAY, IT HAS BEEN REFERED TO THE TRANSPORTATION DEPARTMENT.
01/21/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
06/23/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) PERFORMED AIR TEST ON SECTION OF STORM PIPE UNDER BLDG - TEST OK, OK TO COVER 2) RECIEVED PRELIMINARY APPROVAL FOR CHANGE OF MATERIAL OF STORM PIPE FORM THE ENGINEER OF RECORD
01/24/2022 ENGR Grading Final DROBERTS Approved Entered by VVERA1 - IS APPROVED
06/25/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - WALKED THE SITE TOO SEE WHAT WOULD BE REQUIRED FOR THEM TO RECEIVE A TCO ON THE 3RD AND 4TH FLOORS OF THIS BUILDING. 1) CURRENTLY THERE ARE MANY PANELS OF PLATE GLASS MISSING ON THE NORTHSIDE OF THE BUILDING. 2) ALSO THERE IS EXTERIOR OVER HANGING STRUCTURES THAT HAVE NOT BEEN COMPLETD. THESE AREAS WILL REQUIRE EITHER NIGHT WORK FOR COMPLETION OF WORK OR A COVERED PASSAGEWAY FOR PEDESTRIAN SAFETY THROUGH A CONSTRUCTION ZONE. 3) SEPERATE ALL OPEN CONSTRUCTION WITH FENCING MATERIALS TO PREVENT ACCESS INTO THE CONSTRUCTION ZONE. 4) THE INTERIOR STAIRWAYS ARE NOT PROTECTED IN ALL AREAS TOO PREVENT ACCESS TO CONSTRUCTION AREAS, OR PROTECTION FROM THESE SAME CONSTRUCTION AREAS ABOVE AND BELOW THE OCCUPIED FLOORS. 5) THE 3 ACCESS POINTS NEED TO BE CONSTRUCTED AND MAINTAINED TO PREVENT PEDESTRIAN TRAFFIC FROM ENTERING INTO LIVE CONSTRUCTION AREAS. THIS WORK WILL REQUIRE CONSTRUCTION OF A BARRIER WALL SOUTH OF THE NORTH STAIRWELL AND MANY WALLS AND COVERED WALKWAYS FROM THE SOUTH STAIRWELL OUT TO CONGRESS FROM THE EAST SIDE OF THE SITE. 6) COMPLETE ALL OF THE REMOVAL OF CONSTRUCTION TRASH, DEBRIS AND SOILS ALONG THE NORTHSIDE OF THIS SITE TO ALLOW FOR THE SAFE PASSAGE OF PEDESTRIANS THROUGH THE CONSTRUCTION SITE. ALL ASPECTS IN REGUARDS TO THIS SITE NORTH OF THE NORTH BUILDING LINE BELONG TO TRANSPORTATION SINCE THIS AREA IS WITHIN THE RIGHTS OF WAY. I HAVE ASKED CANYON TO CONTRACT THEIR RIGHT-OF-WAY INSPECTOR TO DETERMINE WHAT IS NEEDED BY THAT DEPARTMENT TO ALLOW FOR THE TCO AT THIS TIME.
05/01/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - LOOKED AT FORMS FOR SIDE WALKS AND LOADING AREA. NO CONCERNS AT THIS TIME
04/30/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - PROGRESS CHECK, NO SITE CONCERNS AT THIS TIME
03/05/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREWS ARE STILL WORKING ON THE UPPER AREAS FOR THIS SITE, ONLY MINOR WORK IS HAPPENING ON THE GROUND LEVEL. A CREW WAS SUPPOSE TO BE READY TO CONNECT THE ROOF DRAINAGE PIPE INTO THE EXISTING BOX CULVERT AT THE NORTHWEST CORNER OF THIS SITE. THIS WORK WILL BE RESCHEDULED AT A LATER DATE. I HAVE REMINDED DAVID WITH CANYON DEVELOPMENT NOT TO LET IS UNDERGROUND SUBCONTRACTOR COVER ANY OF THE PIPING MATERIAL UP BEFORE IT HAS BEEN INSPECTED. i WANT TO SEE THIS WORK ONCE IT IS COMPLETED AND BEFORE IT IS BACKFILLED, ALSO I WILL NEED THE APPROVED PLANS TO BE ON SITE AT THE TIME OF THE INSPECTIONS. ALSO I WILL NEED TO SEE THE PHOTOS OF THE WORK THAT HAS BEEN COVERED AT THIS TIME, SINCE IT APPEARS THAT SOME OF IT MAY NOT HAVE BEEN INSPECTED.
02/12/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - NO WORK ONSITE AT THIS TIME ON THE GROUND AREA. THE ELECTRICAL CONTRACTOR IS WORKIN ON THE UPPER FLOORS ONLY AT THIS TIME.
02/15/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - NO WORK ONSITE AT THIS TIME ON THE GROUND AREA. THE ELECTRICAL CONTRACTOR IS WORKIN ON THE UPPER FLOORS ONLY AT THIS TIME.
06/23/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) PERFORMED AIR TEST ON SECTION OF STORM PIPE UNDER BLDG - TEST OK, OK TO COVER 2) RECIEVED PRELIMINARY APPROVAL FOR CHANGE OF MATERIAL OF STORM PIPE FORM THE ENGINEER OF RECORD
06/22/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) LEAK TESTING REQUIRED FOR STRETCH OF STORM PIPE RUN UNDER THE BLDG. 2) REVISION TO APPROVED PLANS REQUIRED SHOWING MATERIAL USED FOR STORM PIPE UDER THE BLDG ( FROM HDPE TO DUCTILE IRON) .
06/13/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSTALL OF 2-STORM DRAIN MANHOLES, 100 +/- OF 12" HDPE STORM PIP[E AND 2- STORM PRECAST CATCH BASINS ALONG THE WEST SIDE OF BLDG. 2) STORM DRAINAGE SYSTEM INSTALLED PER APPROVED PLANS, PICTURES TAKEN, OK TO COVER
06/06/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CALL FOR INSPECTION PRIOR TO COVERING STORM PIPE INSTALL ALONG SW CORNER OF SITE 2) ENSURE PIPE IS PROPER MATERIAL FOR INSTALL UNDER A BLDG. 3) PIPE MUST BE PRESSURE TESTED PRIOR TO COVER UNDER THE BLDG. 4) NEED EOR APPROVAL FOR PIPE MATERIAL UNDER THE BLDG.