Permit: DP16-0202

Parcel: 117121930


Addresses:

40 E CONGRESS ST


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP16-0202

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/24/2022 ENGR Engineering Final DROBERTS Approved Entered by VVERA1 - IS APPROVED
01/31/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by CBELL1 - The following items have been noted as incomplete or need attention prior to the final inspection this is not to be considered a complete and final list at this time. 1) Missing landscape planters on the North side of this site for total 2 adjacent to the building 2 in the East Parkway. 2) The trash enclosure has not been constructed per the approved plans, this will be shown as Revised on th Tenent Improvement drawings for the 1st Floor. 3) Bicycle racks have not been Constructed as shown on the Approved Drawings. Modifications to all drawings may be needed as they are constructed. 4) Planters in the East and West Courtyards have not been installed and will be installed prior to the final inspection. 5) The new walls and gates into the East and West Courtyards have not be installed, provide revised drawings as needed.
03/14/2022 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
01/24/2022 ENGR Engineering Final DROBERTS Partial Approval Entered by VVERA1 - IS PARTIAL AT THIS TIME, I MET WITH MATT DICKEY ON SITE TO SEE WHAT THE EXTERIOR OF THE BUILDING LOOKS LIKE AND WHAT ITEMS MAY NEED TO BE ADDRESSED PRIOR TO MY APPROVAL: 1) THEY HAVE SCAFFOLDING ON THE EXTERIOR OF THE BUILDING LOCATED IN THE SOUTHEAST QUADRANT THAT IS BEING UTILIZED BY THE SUBCONTRACTOR. 2) THE GENERAL SITE CONDITIONS WILL REQUIRE SOME MINOR CLEANUP, REMOVE ALL EXCESS MATERIALS, CONSTRUCTION TRASH AND DEBRIS, AS WELL AS PORTIONS OF THE INTERIOR ALONG THE SOUTH SIDE OF THIS SITE. 3) ENSURE THAT ALL THE TRASH ENCLOSURE ITEMS (ROLL OUT CANS) ARE ON SITE AND THAT THE LONG TERM BICYCLE PARKING HANGERS HAVE BEEN INSTALLED AS SHOWN ON THE APPROVED PLANS. 4) REMOVE ALL CONSTRUCTION MATERIAL, AND DO A GENERAL SITE CLEANUP PRIOR TO RESCHEDULING THIS INSPECTION WITH ME
01/31/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by CBELL1 - 1) Complete all work as shown on the approved plans. 2) Provide approved revised drawings for the final inspection 3) Provide a certification letter from the engineer record at the final inspection.
06/22/2017 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - PRIOR TO FINAL GRADING APPROVAL, PROVIDE AN APPROVED PLAN SHOWING CHANGES MADE TO STORM PIPE