Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/09/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL STABILIZED ENTRANCE AT SE CORNER
2) SWEEP UP TRACKED SOIL OF ADJACENT ROADWAYS AS NEEDED.
3) PERFORM STORM WATER SELF INSPECTIONS PER SWPPP
4) CALL FOR FOLLOW UP AND PROGRESS CHECKS |