Permit: DP16-0190

Parcel: 10712170H


Addresses:

375 W BLACKLIDGE DR


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP16-0190

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
04/22/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/13/2018 ENGR Grading Final bbenedo1 Not Applicable Entered by BBENEDO1 -
09/13/2018 ENGR Grading Final bbenedo1 Approved Entered by BBENEDO1 -
09/13/2018 ENGR Grading Final bbenedo1 Basin in Good Condition Entered by BBENEDO1 -
03/02/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR HAS COMPLETED THE INSTALLATION OF THE GRAVEL MATERIAL ALONG THE INSIDE FOOTER OF THE NORTH WALL. THIS AREA HAS BEEN APPROVED FOR THE PLACEMENT OF THE BACKFILL MATERIAL FOR THE RETAINING WALL.
02/13/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREWS ARE STILL WORKING ON BUILDING THE STRUCTURES FOR THE LIVING.THE CONTRACTOR HAS BEEN APPROVED TO BACKFILL THE NORTH WALL, THIS WORK HAS NOT STARTED.
09/13/2018 ENGR Grading Final bbenedo1 Approved Entered by BBENEDO1 -
09/13/2018 ENGR Grading Final bbenedo1 Basin in Good Condition Entered by BBENEDO1 -
04/20/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - PROGRESS INSPECTION - NO CONCERNS AT THIS TIME
02/12/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE WALLS ALONG THE NORTHSIDE OF THE PROPERTY AFTER TALKING TO ERNIE STEVENS. I ADVISED THE CONTRACTOR THAT ALL WALLS SHOULD HAVE INDIVIDUAL PERMITS FOR ALL OF THE REQUIRED INSPECTIONS.
03/02/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR HAS COMPLETED THE INSTALLATION OF THE GRAVEL MATERIAL ALONG THE INSIDE FOOTER OF THE NORTH WALL. THIS AREA HAS BEEN APPROVED FOR THE PLACEMENT OF THE BACKFILL MATERIAL FOR THE RETAINING WALL.
02/13/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREWS ARE STILL WORKING ON BUILDING THE STRUCTURES FOR THE LIVING.THE CONTRACTOR HAS BEEN APPROVED TO BACKFILL THE NORTH WALL, THIS WORK HAS NOT STARTED.
09/13/2018 ENGR Grading Final bbenedo1 Approved Entered by BBENEDO1 -
09/13/2018 ENGR Grading Final bbenedo1 Basin in Good Condition Entered by BBENEDO1 -
07/02/2018 ENGR Grading Final DROBERTS Not ready for Inspection Entered by DROBERT5 - TRASH ENCLOSURE FOOTER HAS BEEN EXCAVATED BUT THE REBAR HAS NOT BEEN PLACED AT THIS TIME. COMPLETE THE PLACEMENT OF THE REBAR AND THEN RESCHEDULE THIS INSPECTION.
05/24/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - LOOKED AT THE TRASH ENCLOSURE FOR JOHN, THEY WILL BE PLACING THE REBAR INTO THE FLOOR AREA TOMORROW AND WILL POUR EITHER TOMORROW OR NEXT WEEK.
05/15/2018 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - LOOKED AT TRASH ENCLOSURE RE-BAR LAY OUT AND FOOTING. FOOTING AND RE-BAR INSTALLED PER APPROVED PLANS - OK FOR CONCRETE