Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/19/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
3) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS
4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP
6) POST A COPY OF YOUR NOI ON SITE
7) CALL FOR INSPECTION FOR UNDERGROUND SITE WORK PRIOR TO COVERING |
| 12/16/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CONTACT RE-SCHEDULED |