Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/20/2018 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by KROBLES1 - |
| 05/11/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE X1.0 OF AP PLANS 11X17 IN TRUCK. |
| 01/18/2018 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - COMPLET ALL WORK OUT SIDE BUILDING ON AP PLANS OR PROVIDE COT AP REVISIONS FOR ALL CHANGES TO AP PLANS. (OK FOR TCO). |
| 01/17/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - |
| 10/13/2017 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER WORK TO COMPLET FOR FINAL. |
| 01/31/2017 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH GC ABOUT CALLING FOR PER-CON. |