Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP16-0152
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
05/06/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - JUST A PILE OF SPOILS |
10/18/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CONTRACTORS PERSONNEL ARE BACK WORKING ON THIS SITE FOR THE REMAINING PADS EAST OF THE SANTA CRUZ NORTH OF IRVINGTON. THIS SITE WILL BE CHECKED NEXT WEEK TO SEE WHERE THEY ARE AT WITH THE FINALIZATION OF THIS PERMIT. |
10/17/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - SEE PREVIOUS COMMENTS FOR PREVIOUS DATES |
10/16/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - NO ONE ON THIS SITE AT THIS TIME, SO THIS INSPECTION WILL BE PUT OFF TILL A CONTRACTOR IS ON SITE. SITE WORK WILL NEED TO BE COMPLETED PER THE APPROVED PLANS PRIOR TO SCHEDULING THE FINAL INSPECTIONS. I WILL CONTACTOR BORDERLAND AND ARRANGE FOR AN ONSITE MEETING TOMORROW TO DISCUSS WHAT ARE SOME OF THE ITEMS NEEDED PRIOR TO SCHEDULING FUTURE INSPECTIONS |
10/15/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - NO ONE ON THIS SITE AT THIS TIME, SO THIS INSPECTION WILL BE PUT OFF TILL A CONTRACTOR IS ON SITE. SITE WORK WILL NEED TO BE COMPLETED PER THE APPROVED PLANS PRIOR TO SCHEDULING THE FINAL INSPECTIONS. I WILL CONTACTOR BORDERLAND AND ARRANGE FOR AN ONSITE MEETING TOMORROW TO DISCUSS WHAT ARE SOME OF THE ITEMS NEEDED PRIOR TO SCHEDULING FUTURE INSPECTIONS. |
09/28/2018 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by CMURPHY1 - no address posted, no contact information provided, Job trailer locked. Please reschedule inspection and provide contact information at your convenience |
09/17/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - NO WORK THIS SITE ON THIS ITEM AT THIS TIME, ALL WORK IS FOR THE TRASH ENCLOSURES FOR BLDGS 1 & 2, AND FOR PLANET FITNESS. CURRENTLY THE SITE HAVSE BEEN DENIED AND WILL NEED TO HAVE ADDITIONAL WORK COMPLETE4D BEFORE THEY CAN BE APPROVED FOR THE CURRENT WORK. PLANET FITNESS NEEDS TO BE CONSTRUCTED TO THE DIMENSIONS THAT WE HAVE FOR OUR CURRENT STANDARDS. THE TRASH ENCLOSURE FOR BUILDINGS 1 & 2 HAS BEEN GROUTED ON THE LOWER (0 - 4'), BUT THE CONTRACTOR HAS REMOVED THE UPPER PORTIONS OF THE REBAR. BY DOING THIS IT IS NOT POSSIBLE FOR THEM TO PLACE ADDITIONAL BARS INTO THE CELLS TO ENSURE THAT THERE IS A 2' OVERLAP. I HAVE ASKED THAT THEY GIVE ME A SOLUTION FOR THE WORK THAT THEY WILL NEED TO PERFORM TO MAKE THIS RIGHT. I HAVE ADVISED THEM THAT THEY MAY NEED TO PLACE ADDITIONAL BARS IN THE OPEN CELLS THAT REMAIN AND GROUT THOSE SECTIONS ALSO SO THAT WE CAN INSTALL THE UPPER REBARS. |
08/23/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - HAVE LOOKED OVER THIS SITE AND WILL BE GETTING WITH THE GC FOR THIS SITE AND MAKE SURE THAT ALL OF THE WORK IS COMPLETED PER THE APPROVED PLANS. THERE IS SOME MINOR EROSION HAPPENING IN THE BASINS THAT HAVE NOT BEEN COMPLETED AT THIS TIME, THIS WILL NEED TO BE COMPLETED AND REPAIRED AS NEEDED. |
08/13/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH BRIAN. |
08/03/2018 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - NO ONE ON SITE WHEN I ARRIVED FOR THE INSPECTIONS. THIS SITE WILL BE CHECKED FOR THIS FINAL GRADING ON 8/6/2018 |
08/22/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER SWPPP REPAIRS TO MAKE TO CONTROLS. |
06/27/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER REPAIRS TO SWPPP CONTROLS. |
09/17/2018 | ENGR Grading Final | DROBERTS | Denied | Entered by DROBERT5 - NO WORK THIS SITE ON THIS ITEM AT THIS TIME, ALL WORK IS FOR THE TRASH ENCLOSURES FOR BLDGS 1 & 2, AND FOR PLANET FITNESS. CURRENTLY THE SITE HAVSE BEEN DENIED AND WILL NEED TO HAVE ADDITIONAL WORK COMPLETE4D BEFORE THEY CAN BE APPROVED FOR THE CURRENT WORK. PLANET FITNESS NEEDS TO BE CONSTRUCTED TO THE DIMENSIONS THAT WE HAVE FOR OUR CURRENT STANDARDS. THE TRASH ENCLOSURE FOR BUILDINGS 1 & 2 HAS BEEN GROUTED ON THE LOWER (0 - 4'), BUT THE CONTRACTOR HAS REMOVED THE UPPER PORTIONS OF THE REBAR. BY DOING THIS IT IS NOT POSSIBLE FOR THEM TO PLACE ADDITIONAL BARS INTO THE CELLS TO ENSURE THAT THERE IS A 2' OVERLAP. I HAVE ASKED THAT THEY GIVE ME A SOLUTION FOR THE WORK THAT THEY WILL NEED TO PERFORM TO MAKE THIS RIGHT. I HAVE ADVISED THEM THAT THEY MAY NEED TO PLACE ADDITIONAL BARS IN THE OPEN CELLS THAT REMAIN AND GROUT THOSE SECTIONS ALSO SO THAT WE CAN INSTALL THE UPPER REBARS. |
05/02/2018 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - |
10/19/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - |
10/03/2017 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - LOOKED AT 5 COLUMNS AND 1 WALL FOOTER FOR THE PLACEMENT OF CONCRETE TOMORROW, OTHE SECTION WILL BE CHECKED TOMMORROW FOR COMPLETNESS. |