Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP16-0144
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/26/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) SHOW ANY AND ALL CHANGES TO YOUR STORM WATER PLAN - SIGN AND DATE CHANGES 2) CONTINUE TO PERFORM STORM WATER SELF INSPECTIONS PER YOUR PLAN. 3) INSTALL AND USE A STABILIZED CONSTRUCTION ENTRANCE. 4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE. 5) RE-ESTABLISH SEDIMENT CONTROLS - REMOVE CONSTRUCTION MATERIAL FROM CONTROLS 6) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS ROUTINELY |