Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP16-0144
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/13/2018 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME |
08/31/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT SITE WORK AT THIS TIME 2) ENSURE COMPLIANCE WITH YOUR SWPPP AND STORM WATER PERMIT. |
03/24/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/17/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/14/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/02/2017 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THE SITE CONDITIONS OR TRACKOUT. I HAVE ASKED THE CONTRACTOR TO PROVIDE US WITH DOCUMENTATION FOR THE CONTROLS THAT ARE BEING UTILIZED INSTEAD OF THE WADDLE OR SILT FENCE. HE WILL ASK THE ENGINEER OF RECORD TO PROVIDE US WITH THE SPECIFICATIONS AND AN APPROVAL LETTER STATING THAT THIS MATERIAL IS APPROVED FOR USE ON THIS SITE. |
02/14/2017 | SITE - Stormwater Follow-up | MRUSSO | Correction Required | Entered by DROBERT5 - 1) RE-ESTABLISH SEDIEMNT CONTROLS ALONG THE EAST PERIMETER 2) INSTALL A CONCRETE WASH OUT ON SITE WHEN APPLICABLE 3) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAY ROUTINELY CALL FOR RE-INSPECTION |
02/07/2017 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERLNS AT THIS TIME. THE CONTRACTOR WAS REMINDED TO CALL IN THEIR INSPECTIONS APPROXIMATELY EVERY 2 WEEKS, AND AFTER EVERY RAIN EVENT.I ALSO ASKED THE CONTRACTOR ABOUT THE POSTING OF THE SITE, THEY HAVE RECEIVED THE NOI BUT HAVE NOT POSTED IT AT THIS TIME. THIS SITE WILL BE POSTED BY THE END OF THE WEEK TO MAKE SURE THAT THEY STAY IN COMPLIANCE. |
02/07/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO INSPECTION CALLED IN, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |